Ohio Chemical Manufacturing Plant Fire


Categories: Brand och sot , Kemiska skador , Föroreningar, Vattenskador , Sanering, Tillverkning
 

L OCM
Show Caption
Hide Caption
Scroll through to see photos from this case.
1 OCM
Show Caption
Hide Caption
Kneader extruder before decontamination
2 OCM
Show Caption
Hide Caption
Kneader extruder after decontamination
3 OCM
Show Caption
Hide Caption
Kneader motor drive control panel before decontamination
4 OCM
Show Caption
Hide Caption
Kneader motor drive control panel after decontamination
5 OCM
Show Caption
Hide Caption
Hydraulic power supply before decontamination
6 OCM
Show Caption
Hide Caption
Hydraulic power supply after decontamination
Incident

When a product inside a heated high pressure manufacturing machine caught fire in an Ohio chemical plant, smoke and soot contaminated surrounding equipment. The production floor, which houses state-of-the-art mixing, blending and packaging equipment, was also exposed to water when the fire suppression sprinkler heads activated. In order for the facility to meet its production deadlines, AREPA was immediately dispatched for expedited equipment decontamination.

Challenges & Logistics

AREPA specialists examined the equipment and noted that in addition to smoke, soot and water exposure, the equipment exhibited production byproduct and environmental debris. In order to safely power on the machinery for testing, all of the observed contaminants had to be removed. Water from the sprinklers penetrated open motors and gearboxes, requiring those items to be completely disassembled and dried.

Engineers that were retained to assist with the project scope determined that a portion of electrical panels required replacement, while others were eligible for professional decontamination. Once a cost and replacement lead time analysis was complete, it was determined that the condemned panels were extremely costly and would take six months to build. The replacement route would severely disrupt the facility’s ability to meet customer orders and increase business interruption costs. AREPA provided technical reconditioning options for the condemned panels, which the client used to formulate a business recovery plan. The client decided to recondition the condemned panels and only replace the need parts within them, significantly mitigating production down time.

Outcome

AREPA successfully decontaminated the equipment and reconditioned the condemned control panels. The facility resumed production within weeks as opposed to the engineers estimated six months.

 

Download the PDF



 
Visa alla »
 




Få den hjälp du behöver

Läs mer om vår utrustning restaureringstjänster, underhållstjänster, kontinuitetsråd och mer.

Kontakt »

Senaste nyheterna

Läs mer »